
Case Studies and Projects
Verified results from real facilities.
What results do SSI projects deliver?
Our case studies report what matters to owners and CFOs: facility type, scope, kWh saved, dollars saved, incentive captured, payback and CO2 avoided. Every figure comes from verified project data. Results vary by facility, and we publish only client-approved projects.
Verified, client-approved case studies are being prepared and will be published here. Each reports facility type, scope, kWh saved, dollars saved, incentive captured, payback and CO2 avoided.
How we report results
Measured
IPMVP-compliant results.
Financial
Payback and incentive captured.
Carbon
CO2 avoided at the eGRID rate.
Utility capital pays for part of the upgrade
Each case study shows the incentive captured and the resulting net cost, so you can see how utility capital changed the investment.
- We identify every eligible NV Energy prescriptive and custom incentive.
- We stack lighting with controls to raise the incentive 20–50%.
- We prepare and submit the application, then verify savings under IPMVP.
Quick savings estimate
Adjust the inputs for a planning estimate. The full calculator adds incentives, payback, CO2 and a 10-year view.
Assumes $0.10/kWh and $12/kW-month. Change rates in the full calculator.
Planning estimate only. Actual savings and incentives are confirmed through an on-site audit and utility program approval.
Related solutions
Frequently asked questions
Are these real projects?
We publish real, verified projects only. Placeholders are marked until client-approved results are added.
What metrics do you report?
Facility type, scope, kWh saved, dollars saved, incentive captured, payback and CO2 avoided.
Can we speak to a reference?
Ask your consultant for references in your industry.
How are results verified?
Under IPMVP with metered data.
Turn Your Overhead Into Net Profit.
Book a no-pressure consultation with a veteran energy consultant. We will show you the savings, the incentive and the payback before you commit.
Every month you wait is money lost to inefficiency. Incentive funding is limited per program year.