
Why Silver State Incentives
Engineering over sales. Financial strategy over commodity equipment.
Why choose Silver State Incentives?
Silver State Incentives combines 14 years of specialized energy-efficiency experience with CFO-grade financial modeling and IPMVP-compliant verification. We are not a sales organization: we engineer the right measures, secure utility incentives to help fund them, and protect the savings with 24/7/365 Virtual Energy Management.
The Veteran Advantage
Our consultants bring 14 years of specialized energy-efficiency experience across lighting, HVAC, refrigeration, EMS and incentives.
Engineering Over Sales
We are not a sales organization. We recommend what the engineering and the financials support, nothing more.
We Speak CFO
SIR, IRR, NPV, payback and EBITDA impact for every measure, in a format finance teams can approve.
The Old Way vs. The Silver State Way
Efficiency is not a commodity purchase. It is a financial strategy.
The Old Way
We sell efficient lights and HVAC (commodity).
- GoalSell equipment
- FundingYour capital budget
- MetricPrice per fixture
- After installNobody checks the results
The Silver State Way
We secure utility capital to help pay for your infrastructure upgrades, lowering OpEx to immediately increase EBITDA (financial strategy).
- GoalIncrease net profit
- FundingNV Energy incentives offset project cost
- MetricSIR, IRR, NPV, payback, EBITDA
- After install24/7/365 VEM and IPMVP-verified savings
Energy projects, modeled like capital investments
Most contractors quote equipment. We deliver an investment case: Savings-to-Investment Ratio (SIR), Internal Rate of Return (IRR), Net Present Value (NPV), payback and EBITDA impact. Every dollar of OpEx removed flows straight to EBITDA.
- SIR above 1.0 means the project returns more than it costs.
- IRR you can compare with your hurdle rate.
- Savings verified under IPMVP, not assumed.
300 high-bay fixtures (458 W to 150 W LED) plus networked controls, 4,380 hours per year, $0.10/kWh, $12/kW-month, $400 per installed high-bay and $85 per controlled fixture.
Illustrative example built with the same formulas as our calculator and planning-level costs and incentive rates. Not a client result. Actual figures are confirmed by audit and utility program approval.
What you get with SSI
IPMVP-compliant M&V
Savings are measured, not assumed.
24/7/365 VEM
AI-assisted analysts protect savings.
Incentive specialists
We know NV Energy programs inside out.
Turnover-proof
Your building knowledge lives in VEM.
Multi-site ready
Nevada and nationwide programs.
Carbon reporting
CO2 avoided from metered savings.
Utility capital pays for part of the upgrade
Our incentive expertise lowers your net investment. We find every eligible incentive, stack measures to increase it, and document savings for program approval.
- We identify every eligible NV Energy prescriptive and custom incentive.
- We stack lighting with controls to raise the incentive 20–50%.
- We prepare and submit the application, then verify savings under IPMVP.
Quick savings estimate
Adjust the inputs for a planning estimate. The full calculator adds incentives, payback, CO2 and a 10-year view.
Assumes $0.10/kWh and $12/kW-month. Change rates in the full calculator.
Planning estimate only. Actual savings and incentives are confirmed through an on-site audit and utility program approval.
Related solutions
Frequently asked questions
What makes SSI different from a lighting contractor?
We are not a sales organization. We engineer projects, model them as investments and verify results under IPMVP.
What does 'we speak CFO' mean?
We present SIR, IRR, NPV, payback and EBITDA impact, not just equipment prices.
Who are your consultants?
Veteran consultants with 14 years of specialized energy-efficiency experience.
What happens if savings fall short?
VEM monitors performance 24/7/365 and flags issues so they can be corrected quickly.
Turn Your Overhead Into Net Profit.
Book a no-pressure consultation with a veteran energy consultant. We will show you the savings, the incentive and the payback before you commit.
Every month you wait is money lost to inefficiency. Incentive funding is limited per program year.